South River Tunnel
The South River Tunnel is an extension of the Atlanta infrastructure and sewer systems that involves two construction shafts over 200 ft deep and over 100 ft in diameter to access and construct miles of additional tunneling. It also includes a massive pump station and pump shaft and multiple intake locations.
Tonnage: Approx. 1,000 tons
Schedule: 18 Months
Contractor: Kiewit/GSC Atlanta